Mister Parks held the worker to the wall of the canyon until others came to help. Today, visitors can see a statue of the men who worked as high scalers to build Hoover Dam.
The high scalers worked on the sides of the canyon. Other workers dug huge tunnels deep in the floor of the canyon. This was done to permit the Colorado River to flow away from the construction area. This had to be done so the floor of the dam could be built.
On June sixth, nineteen thirty-three, workers poured the first load of a building material called concrete. Men in two special factories worked day and night to make the concrete building material for the dam.
Huge equipment moved millions of tons of rock and sand. In the summer months, the terrible desert heat slowed the work but did not stop it. Men who worked at night on the dam suffered less, but the heat was still as high as thirty degrees Celsius.
BOB DOUGHTY: Slowly the great dam began to rise from the floor of the canyon. From the canyon floor it reaches two hundred twenty-one meters high. Workers poured the last of the concrete on May twenty-ninth, nineteen thirty-five. They had used almost four million cubic meters of concrete in the dam. Workers also used more than twenty million kilograms of steel to strengthen the concrete in the dam.
STEVE EMBER: The work was dangerous for the more than five thousand men who worked on the structure. The extreme temperatures, falling objects and heavy equipment caused accidents. The workers were provided with medical care and two emergency vehicles to take them to a new hospital in Boulder City. However, ninety-six men lost their lives during the building of the great dam.