More changes came in 1948. At that time, Congress approved the Central and South Florida Project. As part of the plan, the Army Corps of Engineers built roads, canals and water-control systems throughout South Florida.
The project was aimed at providing water and flood protection for developed areas and agriculture. Workers built a huge system of waterways and pumping stations to control the overflow of Lake Okeechobee, north of the Everglades.
Today, some of South Florida’s early wetland areas no longer exist. Populations of wading birds have been reduced by 90 percent. Whole populations of animals are in danger of disappearing. The endangered creatures include the manatee, the Miami blackhead snake, the wood stork and the Florida panther.
In recent years, environmental experts have learned about the damage to the Everglades. Some experts say the balance of nature there has been destroyed.
Thirteen years ago, Congress approved a plan to restore and improve the Everglades. Federal, state and other organizations are partners in the Comprehensive Everglades Restoration Plan. Thomas Van Lent is a scientist with The Everglades Foundation, a not-for-profit group. He says the restoration efforts are moving forward. For example, many roads have been removed.
Early in 2010, ground was broken on the Picayune Strand Restoration Project. The goal of the project is to re-establish natural water flow across more than 22,000 hectares of wetland. Workers removed water from that area in the early 1960s. At the time, the goal was to develop the land for homes. However, the development failed, and healthy wetlands were harmed.