On Sunday Tokyo Electric Power, operator of the damaged reactors at Fukushima, announced that it plans to build its own concrete and steel containment structure with an air filter. It expects to have this shell in place by the end of this year. It did not say how long that structure is designed to last.
最新
2013-11-25
2013-11-25
2013-11-25
2013-11-25
2013-11-25
2013-11-25