The Olympic Village is going to welcome more than 3,000 athletes and team officials during the Vancouver Winter Olympic and Paralympic Games, and the green project will then become a sustainable community with diversified neighbourhoods.
Standing next to the model of Millennium Water, the 2010 Vancouver Games Olympic Village's design manager Roger Bayley said that the project was not really developed for the Olympics but long-term residence.
"We didn't design this (project )thinking it's going to be a great bunch of athletes," said Bayley on Monday. The whole site of 150,000 square meters is going to see about 16,000 people living in the future and all the buildings with sustainable design will give people a better understanding about green concept.
According to him, 65 percent of the heat energy is provided by the sewage water. And with the use of radiant ceiling for the cooling and heating system, the whole project could save up to 50 percent energy. Besides, "the rain water is used to flush toilets here. About eight months of a year, the amount of the rain water is enough for doing this," Barley added.
The city of Vancouver has had a policy of moving people into the core of the city over the past decade. "People could enjoy their lives with the existing resources in the city and there could be less use of transportation so as to save energy." As a result, the waterfront former industrial site near downtown was transformed into an interesting neighbourhood.
【体坛英语资讯:Olympic Village to be sustainable comunity after Vancouver Winter Games】相关文章:
★ 娱乐英语资讯:Halle Berry desperate to work in beaus restaurant
★ 体坛英语资讯:Special athletes assured of a happy environment
★ 体坛英语资讯:Zenit lift UEFA Cup in historical glory
★ 体坛英语资讯:Dutch advance, Italy, France on brink of elimination
★ 体坛英语资讯:Wariner beaten by Australian Batman
★ 体坛英语资讯:Chinas EAFC title hopes dashed after losing to Japan 1-0
★ 娱乐英语资讯:Nicole Rucgue, Joel Madden to wed after birth
★ 体坛英语资讯:Netherlands lands Prix title, China takes silver
★ 体坛英语资讯:Zhu leads Guangdong to CBA title with 31 points
★ 体坛英语资讯:German Football Federation wish to extend contract with Low
最新
2020-09-15
2020-09-15
2020-09-15
2020-09-15
2020-09-15
2020-09-15