In winter, the working system is changed slightly. Water is pumped through the heat exchangers to pick up the heat stored during summer. This water goes into the building and is used to warm the place up. After performing that task, it is pumped under the asphalt and its remaining heat keeps the road free of snow and ice.
1. Which of the following is true according to the first two paragraphs?
A. Arian de Bondt got his idea from his boss.
B. Large, flat, black surfaces need to be built in cities.
C. The Dutch engineer’s system has been widely used.
D. Heat can also be collected from asphalt roads.
2. For what purpose are the diving pipes used?
A. To absorb heat from the sun.
B. To store heat for future use.
C. To turn solar energy into heat energy.
D. To carry heat down below the surface.
3. From the last paragraph we can learn that .
A. some pipes have to be re-arranged in winter
B. the system can do more than warming up the building
C. the exchangers will pick up heat from the street surface
D. less heat may be collected in winter than in summer
4. What is most likely to be discussed in the paragraph that follows?
A. What we shall do if the system goes wrong.
【2016届高考英语二轮复习阅读理解七十五十集之连载训练:(38)】相关文章:
★ 2017届高考英语二轮复习大题冲关秘籍完形填空之记叙文:应试策略(含解析)
★ 四川省2016届高考英语一轮复习课时作业(37) Module 1 Basketball 外研版选修8
★ 2017高考四川省广安市英语阅读理解一轮系列训练:25(含解析)
★ 【浙江专用】2014届高考英语一轮复习课时作业(十九)必修4Unit 4《Body language》
★ 【优化方案】2017届高考英语二轮复习全国卷Ⅱ规范练:5(含解析)
★ 湖南省汝城二中2014届高考英语一轮复习阅读训练 (15)
★ 浙江省湖州市2014高考英语阅读理解一轮(暑假)精炼(16)含答案
★ 重庆市2014高考英语阅读理解一轮(精品)训练题(18)附答案
最新
2017-04-24
2017-04-24
2017-04-24
2017-04-24
2017-04-21
2017-04-21