To produce electricity on a large scale, a commercial wind farm will have to use bigger turbines than Hywind does, but it’s difficult enough to balance such a large turbine so high on a floating spar in the middle of the ocean. To make that turbine heavier, the whole spar’s centre of gravity must be moved much closer to the ocean’s surface. To do that, the company plans to design a new kind of wind turbine, one whose gearbox (变速箱) sits at sea level rather than behind the blades (see picture).
Hywind is a test run, but the benefits for perfecting floating wind-farm technology could be extremely large. Out at sea, the wind is often stronger and steadier than close to shore, where all existing offshore windmills are planted. Deep-sea farms are invisible from land, which helps overcome the windmill-as-eyesore objection. If the technology catches on, it will open up vast areas of the planet’s surface to one of the best low-carbon power sources available.
1. The Hywind project uses totally new technology to ensure the stability of .
A. the cables which tie the spar to the ocean floor
B. the spar which is floating in deep-sea water
C. the blades driven by strong and steady sea wind
D. the stones filled in the spar below the sea surface
2. To balance a bigger turbine high on a floating spar, a new type of turbine is to be designed with its gearbox sitting .
【2016届高考英语二轮复习阅读理解一百四十集选练:(135)】相关文章:
★ 常熟市2014高考英阅读理解语一轮(暑假)训练题(1)及答案
★ 湖南省汝城二中2014届高考英语一轮复习阅读训练 (64)
★ 【北师大版】2014届高考英语一轮复习指导课时作业:Unit 9 B卷 Word版含解析
★ 【三维设计】2017届高考英语(江苏专用)二轮复习阅读理解解题技法示范课件:3
★ 【优化方案】2017届高考英语二轮复习全国卷Ⅱ题型重组训练:第4组(含解析)
★ 【北京专用】2014届高考英语一轮复习方案课时作业:必修2 Unit 1 Cultural relics
★ 浙江省湖州市2014高考英语阅读理解一轮(暑假)精炼(8)含答案
★ 常熟市2014高考英阅读理解语一轮(暑假)训练题(4)及答案
★ 【北京专用】2014届高考英语一轮复习方案课时作业:必修4 Unit 4 Body language
最新
2017-04-24
2017-04-24
2017-04-24
2017-04-24
2017-04-21
2017-04-21