In winter, the working system is changed slightly. Water is pumped through the heat exchangers to pick up the heat stored during summer. This water goes into the building and is used to warm the place up. After performing that task, it is pumped under the asphalt and its remaining heat keeps the road free of snow and ice.
1. Which of the following is true according to the first two paragraphs?
A. Arian de Bondt got his idea from his boss.
B. Large, flat, black surfaces need to be built in cities.
C. The Dutch engineer’s system has been widely used.
D. Heat can also be collected from asphalt roads.
2. For what purpose are the diving pipes used?
A. To absorb heat from the sun.
B. To store heat for future use.
C. To turn solar energy into heat energy.
D. To carry heat down below the surface.
3. From the last paragraph we can learn that .
A. some pipes have to be re-arranged in winter
B. the system can do more than warming up the building
C. the exchangers will pick up heat from the street surface
D. less heat may be collected in winter than in summer
4. What is most likely to be discussed in the paragraph that follows?
A. What we shall do if the system goes wrong.
【2016届湖南长沙市高考英语二轮阅读理解训练(37)(含答案)】相关文章:
★ 贵州省贵阳市2014高考英语(新人教版)一轮阅读训练(31)附答案
★ 常熟市2014高考英阅读理解语一轮(暑假)训练题(3)及答案
★ 【优化方案】2017届高考英语二轮复习全国卷Ⅱ规范练:2(含解析)
★ 贵州省贵阳市2014高考英语(新人教版)一轮阅读训练(32)附答案
★ 湖南省汝城二中2014届高考英语一轮复习阅读训练 (46)
★ 【课堂新坐标】2017届高考英语(通用版)二轮复习短文改错专题训练:训练2 短文改错(Ⅱ)(含解析)
★ 【优化方案】2017届高考英语二轮复习全国卷Ⅱ题型重组训练:第12组(含解析)
★ 【课堂新坐标】2017届高考英语(通用版)二轮复习短文改错专题训练:考法3 行文逻辑错误(含解析)
★ 浙江省湖州市2014高考英语阅读理解一轮(暑假)精炼(17)含答案
最新
2017-04-24
2017-04-24
2017-04-24
2017-04-24
2017-04-21
2017-04-21