高考英语二轮专题复习阅读理解极限突破测试卷(4)
阅读理解A
According to the US government, wind farms off the Pacific coast could produce 900 gig watts of electricity every year. Unfortunately, the water there is far too deep for even the tallest windmills (see picture) to touch bottom. An experiment under way off the coast of Norway, however, could help put them anywhere.
The project, called Hywind, is the world’s first large-scale deepwater wind turbine(涡轮发电机).Although it uses a fairly standard 152-ton,2.3-megawatt turbine, Hywind represents totally new technology. The turbine will be fixed 213 feet above the water on a floating spar(see picture),a technology Hywind’s creator, the Norwegian company StatoilHydro, has developed recently. The steel spar, which is filled with stones and goes 328 feet below the sea surface, will be tied to the ocean floor by three cable(缆索);these will keep the spar stable and prevent the turbine from moving up and down in the waves. Hywind’s stability(稳定性)in the cold and rough sea would prove that even the deepest corners of the ocean are suitable for wind power. If all goes according to plan, the turbine will start producing electricity six miles off the coast of southwestern Norway as early as September.
To produce electricity on a large scale, a commercial wind farm will have to use bigger turbines than Hywind does, but it’s difficult enough to balance such a large turbine so high on a floating spar in the middle of the ocean. To make that turbine heavier, the whole spar’s to design a new kind of wind turbine, one whose gearbox(变速箱) sits at sea level rather than behind the blades (see picture )
【2016届高考英语二轮专题复习阅读理解极限突破测试卷(4)】相关文章:
★ 2017届高考英语二轮复习大题冲关秘籍语法填空:解题技巧(含解析)
★ 湖南省汝城二中2014届高考英语一轮复习阅读训练 (36)
★ (全国通用)2014届高考英语一轮单元复习 限时强化训练二
★ 重庆市2014高考英语阅读理解一轮(精品)训练题(19)附答案
★ 2017届高考英语二轮复习大题冲关秘籍完形填空之夹叙夹议文:考纲分析(含解析)
★ (全国通用)2014届高考英语一轮单元复习 限时强化训练五
最新
2017-04-24
2017-04-24
2017-04-24
2017-04-24
2017-04-21
2017-04-21