D. to increases global warming and generate electricity
3. The dam is nearly _____ metres high and _____ kilometres wide.
A. 20, 1.5
B. 25, 2,5
C. 30, 3
D. 40, 3.5
4. The dam will generate electricity equal to about ____ million tons of coal without causing so much air pollution.
A. 30
B. 40
C. 50
D. 60
Ⅳ Reading
In an interview with Xinhua, Li Yong'an, general manager of China Yangtze River Three Gorges Project Development and Construction Corporation, said the Three Gorges dam would be put into use when the summer flood season begins, when water levels in the Three Gorges Reservoir are expected to rise to 156 meters.
Workers with the Three Gorges Project that is being built at the middle reaches of the Yangtze River are racing to raise dam heights at the southern bank of the river from the current 160 meters to 185 meters by May.
In the meantime, the workers are requested to accomplish two more main tasks this year, namely, to complete the two-way five-tier shiplock facility built on the northern bank of the Yangtze and to prepare for the planned installation of 12 more turbogenerators on the southern bank in 2007 and 2008, according to Li.
Launched in 1993, the Three Gorges Project, including a 185-m-high dam and 26 generators on both banks of the Yangtze, is being built in three phases on the middle reaches of China's longest river, the Yangtze.
【2017高三英语一轮复习学案:Review of Module 6 Book 3(外研版必修3)】相关文章:
★ 【北师大版】2014届高考英语一轮复习指导课时作业:Unit 9 B卷 Word版含解析
★ 2014届高考英语一轮复习课时作业(三十四)选修6Module 4《Music》(外研版)
★ (安徽专用)2014届高考英语一轮复习方案 作业手册(13)模块5 《Unit 13 People》(含解析) 北师大版必修1
★ 四川省2016届高考英语一轮复习课时作业(33) Module 3 Interpersonal Relationships Friendship 外研版选修6
★ 四川省2016届高考英语一轮复习课时作业(41) Module 5 Ethnic Culture 外研版选修8
★ 【北师大版】2014届高考英语一轮复习指导课时作业:Unit 7 B卷 Word版含解析
★ 2017高三英语一轮复习学案:Module 4(外研版必修1)
★ 2014届高考英语一轮复习课时作业(五)必修1Module 5《A Lesson in a Lab》(外研版)
最新
2017-04-24
2017-04-24
2017-04-24
2017-04-24
2017-04-21
2017-04-21