For now,geothermal energy makes up less than 1 percent of the energy needs in Japan,which has for decades relied heavily on fossil fuels and atomic power.
The biggest problem to geothermal energy is the high initial cost of the exploration and constructing the factories.Another problem is that Japan’s potentially best sites are already being developed for tourism or are located within national parks where construction is forbidden.
“We can’t even dig 10 cm inside national parks.” said Shigeto Yamada of Fuji Electric,adding that regulations protecting nature would need to be relaxed for geothermal energy to grow.
Researcher Hideaki Matsui said,“Producing electricity using hot springs is a decadeslong project.We also have to think about what to do for now as energy supplies will decline in the short term.”
The Earth Policy Institute in Washington,US,believed Japan could produce 80 000 megawatts (兆瓦) and meet more than half its electricity needs with geothermal technology.
Japanese giants such as Toshiba are already global leaders in geothermal technology,with a 70 percent market share.In 2010,Fuji Electric built the world’s largest geothermal factory in New Zealand.
1.What would be the best title for the text?
A.Alternative energies in Japan
B.World’s largest geothermal plant
【2017届广西来宾市高考英语一轮复习阅读理解专项练习:37(含解析)】相关文章:
★ 湖南省汝城二中2014届高考英语一轮复习阅读训练 (24)
★ 湖南省汝城二中2014届高考英语一轮复习阅读训练 (40)
★ 浙江省湖州市2014高考英语阅读理解一轮(暑假)精炼(1)含答案
★ 安徽省淮南市2014高考英语一轮单项选择及文章训练(20)及答案
★ 重庆市2014高考英语阅读理解一轮(精品)训练题(2)附答案
★ 安徽省淮南市2014高考英语一轮单项选择及文章训练(5)及答案
★ 湖南省汝城二中2014届高考英语一轮复习阅读训练 (22)
★ (全国通用)2014届高考英语一轮单元复习 限时强化训练一
最新
2017-04-24
2017-04-24
2017-04-24
2017-04-24
2017-04-21
2017-04-21