For now,geothermal energy makes up less than 1 percent of the energy needs in Japan,which has for decades relied heavily on fossil fuels and atomic power.
The biggest problem to geothermal energy is the high initial cost of the exploration and constructing the factories.Another problem is that Japan’s potentially best sites are already being developed for tourism or are located within national parks where construction is forbidden.
“We can’t even dig 10 cm inside national parks.” said Shigeto Yamada of Fuji Electric,adding that regulations protecting nature would need to be relaxed for geothermal energy to grow.
Researcher Hideaki Matsui said,“Producing electricity using hot springs is a decadeslong project.We also have to think about what to do for now as energy supplies will decline in the short term.”
The Earth Policy Institute in Washington,US,believed Japan could produce 80 000 megawatts (兆瓦) and meet more than half its electricity needs with geothermal technology.
Japanese giants such as Toshiba are already global leaders in geothermal technology,with a 70 percent market share.In 2010,Fuji Electric built the world’s largest geothermal factory in New Zealand.
1.What would be the best title for the text?
A.Alternative energies in Japan
B.World’s largest geothermal plant
【2015届高考英语一轮复习限时训练:作业4(含答案)】相关文章:
★ 【课堂新坐标】2017届高考英语(通用版)二轮复习书面表达专题训练:技法1 认真审题拟出全部要点(含解析)
★ 【北京专用】2014届高考英语一轮复习方案课时作业:选修7 Unit 4 Sharing
★ 四川省2016届高考英语一轮复习课时作业(21) Module 3 Body Language and Non verbal Communication 外研版必修4
★ 四川省2016届高考英语一轮复习课时作业(32) Module 2 Fantasy Literature 外研版选修6
★ 2017年高考英语二轮复习精品资料:专题15 完形填空(押题专练)(原卷版)
★ 【北京专用】2014届高考英语一轮复习方案课时作业:必修5 Unit 2 The United Kingdom
★ 2017高考四川省广安市英语阅读理解一轮系列训练:27(含解析)
★ 【三维设计】2017届高考英语(江苏专用)二轮复习素材:高考单词3.高中单词分类记忆
最新
2017-04-24
2017-04-24
2017-04-24
2017-04-24
2017-04-21
2017-04-21