For now,geothermal energy makes up less than 1 percent of the energy needs in Japan,which has for decades relied heavily on fossil fuels and atomic power.
The biggest problem to geothermal energy is the high initial cost of the exploration and constructing the factories.Another problem is that Japan’s potentially best sites are already being developed for tourism or are located within national parks where construction is forbidden.
“We can’t even dig 10 cm inside national parks.” said Shigeto Yamada of Fuji Electric,adding that regulations protecting nature would need to be relaxed for geothermal energy to grow.
Researcher Hideaki Matsui said,“Producing electricity using hot springs is a decadeslong project.We also have to think about what to do for now as energy supplies will decline in the short term.”
The Earth Policy Institute in Washington,US,believed Japan could produce 80 000 megawatts (兆瓦) and meet more than half its electricity needs with geothermal technology.
Japanese giants such as Toshiba are already global leaders in geothermal technology,with a 70 percent market share.In 2010,Fuji Electric built the world’s largest geothermal factory in New Zealand.
1.What would be the best title for the text?
A.Alternative energies in Japan
B.World’s largest geothermal plant
【2015届高考英语一轮复习限时训练:作业4(含答案)】相关文章:
★ 2014届高考英语一轮复习课时作业(十六)必修3Module 4《Sandstorms in Asia》(外研版)
★ 【优化方案】2017届高考英语二轮复习全国卷Ⅱ题型重组训练:第2组(含解析)
★ 湖南省汝城二中2014届高考英语一轮复习阅读训练 (13)
★ 【优化方案】2017届高考英语二轮复习全国卷Ⅱ题型重组训练:第18组(含解析)
★ 四川省2016届高考英语一轮复习课时作业(21) Module 3 Body Language and Non verbal Communication 外研版必修4
★ 湖南省汝城二中2014届高考英语一轮复习阅读训练 (23)
★ 2017年高考英语二轮复习精品资料:专题15 完形填空(押题专练)(原卷版)
★ 2017届高考英语二轮复习大题冲关秘籍阅读理解七选五:体验真题(含解析)
★ 安徽省淮南市2014高考英语一轮单项选择及文章训练(10)及答案
最新
2017-04-24
2017-04-24
2017-04-24
2017-04-24
2017-04-21
2017-04-21