For now,geothermal energy makes up less than 1 percent of the energy needs in Japan,which has for decades relied heavily on fossil fuels and atomic power.
The biggest problem to geothermal energy is the high initial cost of the exploration and constructing the factories.Another problem is that Japan’s potentially best sites are already being developed for tourism or are located within national parks where construction is forbidden.
“We can’t even dig 10 cm inside national parks.” said Shigeto Yamada of Fuji Electric,adding that regulations protecting nature would need to be relaxed for geothermal energy to grow.
Researcher Hideaki Matsui said,“Producing electricity using hot springs is a decadeslong project.We also have to think about what to do for now as energy supplies will decline in the short term.”
The Earth Policy Institute in Washington,US,believed Japan could produce 80 000 megawatts (兆瓦) and meet more than half its electricity needs with geothermal technology.
Japanese giants such as Toshiba are already global leaders in geothermal technology,with a 70 percent market share.In 2010,Fuji Electric built the world’s largest geothermal factory in New Zealand.
1.What would be the best title for the text?
A.Alternative energies in Japan
B.World’s largest geothermal plant
【2015届高考英语一轮复习限时训练:作业4(含答案)】相关文章:
★ 2014高考英语(新人教版)一轮基础训练(18)A、B卷(附答案或解析)
★ 【优化方案】2017届高考英语二轮复习全国卷Ⅱ题型重组训练:第2组(含解析)
★ 2017年高考英语二轮复习精品资料:专题15 完形填空(押题专练)(原卷版)
★ 湖南省汝城二中2014届高考英语一轮复习阅读训练 (23)
★ 四川省2016届高考英语一轮复习课时作业(32) Module 2 Fantasy Literature 外研版选修6
★ 【北京专用】2014届高考英语一轮复习方案课时作业:必修5 Unit 2 The United Kingdom
★ 【优化方案】2017届高考英语二轮复习全国卷Ⅱ题型重组训练:第18组(含解析)
★ 2017高考四川省广安市英语阅读理解一轮系列训练:27(含解析)
★ 【优化方案】2017届高考英语二轮复习全国卷Ⅱ题型重组训练:第17组(含解析)
最新
2017-04-24
2017-04-24
2017-04-24
2017-04-24
2017-04-21
2017-04-21