.Sun Yatsen first 2.
that a dam should be across the Yangtze River in 1911.
3.
of the Three Gorges Dam ★The biggest 4.
project in China since the building of the Great Wall and the Grand Canal.
★Nearly 200 meters high and 1.5 kilometers wide.
★The largest hydroelectric 5.
and dam in the world.
Advantages of The Three Gorges Dam ★6.
flooding.
★Providing hydroelectric power.
★7.
electricity equal to about 40 million tons of coal.
8.
of the
Three Gorges Dam ★Destroying many cities,counties,towns and villages.
Flooding some famous 9.
sites.
★10.
about 800 relics.
【答案】 1.poem 2.suggested 3.Description 4.construction 5.power station 6.Controlling 7.Generating 8.Disadvantages 9.historical 10.Submerging
.语篇理解
阅读P53的Reading and Vocabulary部分,从每题所给的3个选项中选出最佳答案
1.Why is the Three Gorges Dam constructed?
A.To harness the Yangtze River.
B.To control flooding and provide power for the central region of China.
【2015届高考英语一轮复习教案:Module 6《Old and New》(外研版必修三)】相关文章:
★ (全国通用)2014届高考英语一轮单元复习 限时强化训练十
★ (安徽专用)2014届高考英语一轮复习方案 作业手册(17)模块6 《Unit 17 Laughter》(含解析) 北师大版必修1
★ (安徽专用)2014届高考英语一轮复习方案 作业手册(22)模块8 《Unit 22 Environmental Protection》(含解析) 北师大版必修1
★ 天津市武清区杨村第四中学2016届高考英语一轮复习语法专题三《其他特殊句型》课件外研版
★ 2014届高考英语一轮复习课时作业(十八)必修3Module 6《Old and New》(外研版)
★ 2017届江苏省淮安市新马中学高考牛津译林版英语一轮复习活动单:模块6 Unit 1《Laughter is good for you》
★ 【北师大版】2014届高考英语一轮复习指导课时作业:Unit 9 A卷 Word版含解析
★ 【优化方案】2017届高考英语二轮复习全国卷Ⅱ规范练:5(含解析)
★ (安徽专用)2014届高考英语一轮复习方案 作业手册(2)模块1 《Unit 2 Heroes》(含解析) 北师大版必修1
最新
2017-04-24
2017-04-24
2017-04-24
2017-04-24
2017-04-21
2017-04-21