403 The design of the process piping is performed directly on a model of the project.
工艺配管的设计是直接按照工程项目的一个模型完成的。
404 The model is an actual working tool for piping.
模型是配管用的实际工具。
405 Piping erection work include: prefabrication, placing, aligning, welding and bolting.
管道安装工作包括:预制加工、安置、对准、焊接和连接。
406 Our piping prefabrication workshop covers a total area of 1000m2.
我们的管道预制加工厂拥有一千平方米的面积。
407 We can perform the pipe by following operations: cutting and mechanical chamfering, manual and automatic welding.
我们可以对管子进行下列预制加工:切割和机械加工坡口,手工和自动焊接等。
408 The computer generates isometric drawings and prints out bill of materials.
计算机绘出管道空视图,并打印出材料明细表。
409 We shall complete the manhour requirements for the site fabrication (site erection ) of this drawing.
我们将制订这张图纸现场制作(现场安装)所需的工时条件。
410 Seamless steel tube is made in sizes for 1/8 to 24 inches.
【谈论工艺管道1】相关文章:
★ 谈论人的悲伤!
★ 安乐死人道吗
★ 谈论奉承!
★ 讨论过去事
★ 失火1
★ 讲述骑车日记1
最新
2016-02-29
2016-02-29
2016-02-29
2016-02-29
2016-02-29
2016-02-29