Preparations and construction of the first phase were carried out between 1993 and 1997. The Yangtze was dammed at the Three Gorges area for the first time on November 8, 1997.
According to the plan, the completed Three Gorges Project, costing an estimated 180 billion yuan (approximately US$21.7 billion), will have 26 generators with a combined generating capacity of 18.2 million kw. Most of the construction on the northern bank of the Yangtze has been completed so far, including the 14 turbo generators, which have been installed and put to work.
According to Li, these turbo generators generated 49.09 billion kw/hour of electricity in 2005.
The Three Gorges Project is expected to be completed in 2009, generating 84.7 billion kwh of electricity annually. (Xinhua News Agency January 10, 2006)
【2017高三英语一轮复习学案:Review of Module 6 Book 3(外研版必修3)】相关文章:
★ 四川省2016届高考英语一轮复习课时作业(41) Module 5 Ethnic Culture 外研版选修8
★ 2017届高考英语二轮复习大题冲关秘籍语法填空:名校模拟(含解析)
★ 【北师大版】2014届高考英语一轮复习指导课时作业:Unit 7 B卷 Word版含解析
★ 2014届高考英语一轮复习课时作业(十四)必修3Module 2《Developing and Developed Countries》(外研版)
★ 2014届高考英语一轮复习课时作业(九)必修2Module 3《Music》(外研版)
★ (安徽专用)2014届高考英语一轮复习方案 作业手册(3)模块1 《Unit 3 Celebration》(含解析) 北师大版必修1
★ 2014届高考英语一轮复习课时作业(三十四)选修6Module 4《Music》(外研版)
★ 四川省2016届高考英语一轮复习课时作业(45) Module 3 Foreign Food 外研版选修8
★ 2017高三英语一轮复习学案:Module 4(外研版必修1)
最新
2017-04-24
2017-04-24
2017-04-24
2017-04-24
2017-04-21
2017-04-21