To produce electricity on a large scale, a commercial wind farm will have to use bigger turbines than Hywind does, but it’s difficult enough to balance such a large turbine so high on a floating spar in the middle of the ocean. To make that turbine heavier, the whole spar’s to design a new kind of wind turbine, one whose gearbox(变速箱) sits at sea level rather than behind the blades (see picture )
Hywind is a test run, but the benefits for perfecting floating wind-farm technology could be extremely large. Out at sea, the wind is often stronger and steadier than close to shore, where all existing offshore windmills are planted. Deep-sea farms are invisible from land, which helps overcome the windmill-as-eyesore objection. If the technology catches on, it will open up vast areas of the planet’s surface to one of the best low-carbon power sources available.
(
) 1. The Hywind project uses totally new technology to ensure the stability of _______.
A. the cables which tie the spar to the ocean floor
B. the spar which is floating in deep-sea water
C. the blades driven by strong and steady sea wind
D. the stones filled in the spar below the sea surface
(
) 2. To balance a bigger turbine high on a flatting spar, a new type of turbine is to be designed with its gearbox sitting ____________.
【2016黄石市高考英语完形填空和阅读理解一轮练习(3)及答案】相关文章:
★ 2014高考英语(新人教版)一轮基础训练(6)A、B卷(附答案或解析)
★ 浙江省湖州市2014高考英语阅读理解一轮(暑假)精炼(13)含答案
★ 浙江省湖州市2014高考英语完形填空一轮(暑假)精炼(4)含答案
★ 河南省三门峡市2014高考英语一轮(暑假)基础训练(3)附答案
★ 浙江省湖州市2014高考英语完形填空一轮(暑假)精炼(7)含答案
★ 四川省2016届高考英语一轮复习课时作业(43) Module 1 Deep South 外研版选修8
★ 安徽省淮南市2014高考英语一轮单项选择及文章训练(9)及答案
★ 浙江省湖州市2014高考英语完形填空一轮(暑假)精炼(9)含答案
最新
2017-04-24
2017-04-24
2017-04-24
2017-04-24
2017-04-21
2017-04-21