There is a miracle that the gorge rises out of the Pinghu Lake. After thousands of years of free and unruly flow, the dream of "high gorge out of Pinghu" will come true soon. Isn't it? The Gezhouba Water conservancy project, which was built in 1986, has structures such as upper barrage, spillway, hydropower station, channel, etc. the total length of the dam is 1983 meters, the height of the dam is 185 meters, the normal water level is 175 meters, the total storage capacity is nearly 400 m3, the annual power generation is 84 billion degrees, the completion of the project will take 18 years, and a total of 1.13 million people will be resettled. It is a great project that the whole country and the world pay special attention to.
近年又在葛洲坝上游兴建三峡工程,这是跨世纪的宏伟
In recent years, the Three Gorges project was built in the upper reaches of Gezhouba Dam, which is a grand project across the century
建设,要在2009年全部完工,使防洪、发电、养殖、通航
Construction should be completed in 2009 to ensure flood control, power generation, breeding and navigation
于一体,将成为世界最大水力发电站,万吨巨轮可驶抵重庆。
In one, it will become the world's largest hydroelectric power station, with 10000 tons of ships to reach Chongqing.
峡区景色更加绚丽多姿。
The scenery in the gorge area is more colorful.
【即将绝版的三峡】相关文章:
★ The Person I like Most 我最喜欢的一个人
★ 初一英语作文:How to Learn English Well