An extensive energy system has now been formed with hydropower as the mainstay, backed up by geothermal, wind, and solar energy sources. Lhasa's Ethernet ring network project and power transmission and transformation project, the Qinghai-Tibet Power Grid Interconnection Project, and the Sichuan-Tibet Interconnection Project have officially gone into operation, so consigning to history the previously solitary operation of Tibet Autonomous Region power line. Such emergency power supply projects as Zhikong Hydropower Station, Shiquanhe Hydropower Station, Xueka Hydropower Station, Yangbajain Geothermal Power Station, and Lhasa's thermal power plant have been built and put into operation. Zam Hydropower Station, the hydroelectric project with the biggest installed capacity in the Region, has also become operational. Moreover, the building of energy bases was facilitated. In 2014 the total installed generating capacity reached 1.697 million kw, and the annual output of generated electricity came to 3.22 billion kwh. Tibet initiated and carried out power construction projects in Nyima County and Tsonyi in Nagchu, and in seven counties and one township in Ngari that were without electricity. The Region has demonstrated and promoted 30,000 photovoltaic (PV) systems, established 90 PV power plants, and more than 1,200 solar streetlamps, with a total installed capacity of 8,000 kw. By the end of 2012, all administrative villages had access to electricity, and the problem of electricity access had been basically solved.
【《民族区域自治制度在西藏的成功实践》白皮书】相关文章:
★ QE3问答
★ l played with some kangaroos
最新
2020-09-15
2020-09-15
2020-09-15
2020-09-15
2020-09-15
2020-09-15